Insightek.ai
Customer cases

Real deployments, anonymized results.

What shipped. How it was measured. What we could and could not publish.

Every case below is a real Insightek deployment on a manufacturing line. We believe the only useful case study is one where the test method and baseline are disclosed alongside the number — so we publish each one against that standard.

Most customers on this list are under NDA. Identifying details — company names, product descriptions, line layouts — have been anonymized or replaced with industry descriptors. Quantitative results are published only when the customer has approved the specific numbers; otherwise we publish qualitative outcomes and make the full figures available under mutual NDA during POC scoping.

Electronic equipment manufacturing Visual Inspection

Control-module assembly for electronic equipment

A contract manufacturer of electronic equipment runs a high-mix control-module line with heavy text-content and component-placement variance. Visual Inspection AI Agent replaced brittle rule-based vision across multiple stations.

Read the case →
Electronic manufacturing services Visual Inspection

Multi-model PCB inspection at an EMS factory

A contract EMS factory runs complex PCBs where each product variant has a different BOM. Visual Inspection AI Agent replaces per-BOM template authoring with a single register-and-confirm workflow.

Read the case →
OEM contract manufacturing Visual Inspection

Cylindrical-label integrity checking at an OEM

A contract OEM producing cylindrical consumer housings needed to guarantee that every label rolled onto the product had correct text, a readable barcode, and a valid serial number. Classical OCR fails on curved surfaces with inconsistent lighting.

Read the case →
Precision electronics Action Compliance

Three-week rollout at a precision electronics line

A precision electronics manufacturer had two pains: recurrent missed-assembly batches at a key station, and an opaque bottleneck no one could localize. Action Compliance was deployed across the critical stations in three weeks.

Read the case →

Is your line the next case study?

Book a 30-minute engineering call. We will walk through your line, your constraints, and a realistic POC plan.